Current show

La nuit en direct

00:00 05:00


Installation of lighting equipment for the Félix-Gabriel-Marchand bridge should take place from April 25 to 30

Installation of lighting equipment for the Félix-Gabriel-Marchand bridge should take place from April 25 to 30

31 March 2022 à 12:00 am

The continuation of the installation of equipment for the lighting of the Félix-Gabriel-Marchand bridge should begin on April 25 and end on April 30. The organization responsible for carrying out this project, Phare Ouest, has indicated that the lighting and the interactive application will be operational starting April 30. The inauguration of the lighting should take place towards the end of May or the beginning of June. The installation of the equipment by the firm NOVOM Interactive had been stopped this winter because of the intense cold.


CHIP 101.9’s live stream will start right after this commercial